Activity Highlights - I

  

 

 

Up     2000 - 2004        2005 - 2009        2010 - Present 

 

 

 

 

Through The Support and Efforts of Many! 

 




 

 

 

 

Re-roofed Friendship Lodge (Oct 2000)

   


 Return to Top

 

 

Built ten boardwalk (bridge) sections for West Hill Road safety trail to Platt (Mar 2001)

Installed (Jun 2001)

 

 


 

     Return to Top

 

 

Built 8 three tier bunk beds in Loomis left (Jun 2001)

 


    Return to Top

 

Completed new Latrines in Northrup and Ledge (Jun 2001) 

  


  Return to Top

 

  

Three Flag Poles Installed at International Campsite (Sep-Oct 2001)

 


    Return to Top

 

 

The new Boat House affording some badly needed storage (Oct.2001 - Jan 2002?)

Doors built (Sep 2004)

 


     Return to Top

 

 

Ranger Dave built Tunnel Well House (Spring 2002) 

 


   Return to Top

 

Five new boardwalk sections for the West Hill Rd. safety trail to Platt Field (Mar 2002 & 2003?)

 


 

   Return to Top 

 

3D Archery added to Archery program, three shooting stations constructed (Apr 2002) 

 


    Return to Top

  

 

Maint Shop Rehab and reorganization Starts - Painted (Jan 2003)

A never ending project!

 


    Return to Top 

 

Broom Caddy constructed for Dining Room (Winter/Spring 2004)

 


    Return to Top

 

The Rangers Residence is expanded, add to that; a new furnace and a/c,

 windows and vinyl siding all around and topped off by a new roof.  (Oct 2001-Spring 2003)

 


  Return to Top

 

 Maxim Chapel

Trees cleared Fall of 2001, Ground Breaking Sring 2002, Dedicated June 8, 2003

 

 


 

  Return to Top

 

7500 Gallon Water Storage Facility 

 In memory of Life Scout Timothy E. Burke ,February 21, 1966 – March 20, 2001

Who shared a passion for Scouting and Camp Sequassen. Forever a camper,

camp staff member, Ranger Assistant, best friend and beloved son.

From his family and friends. (Fall 2002 - Jun 2003)

 


Return to Top 

  

 

New cabin tables and benches for all the Winter Lodges

 constructed at mini work parties (Nov 2002-Nov 2003) 

  


  Return to Top

  

 Built 13 Handicrafts benches (Jan-May 2004)

  


   Return to Top

  

A total of ten park benches constructed (Feb-Mar 2004)

Later installed; Along trails - 1 below Alderman (? 2004), 1 by Tunnel (? 2004) and 1 West

of Cedar (? 2004), and 4 at Climbing Tower (Jun 2004) and 3 at Waterfront (Jun 2005).

 


  Return to Top

 

Built 4 ...Yak Racks to hold our various Yaks at the waterfront (Mar-Apl 2004)

 


  Return to Top

 

 

Boarder Benches installed along East side of Clark field (Spring 2004)

 


  Return to Top

 

A Traverse wall is harder than it is tall (May 2004) 

  


  Return to Top

 

Bell added to the Chapel (Jun 2004)

 


  Return to Top

 

 

3 Flag staffs have been added at the Maxim Chapel

Made possible through a donation from Lucille and Arnold Alderman (Jun 2004)

 


  Return to Top

 

A Climbing Tower 35" tall, now stands to challange one and all. (Jun 2004)

 The Tower has been reinforced with guy wires, protection against wind shears (Nov 2009)

 


 

   Return to Top

 

 

BACK     2000 - 2004        2005 - 2009        2010 - Present 

 

 

 

While it is not practical nor was it intended

 

to reflect every contribution made at camp

 

please feel free to submit for consideration

 

pictures and/or information.

 

 

Contact Pat Maxim with regard content of this page